Turf BusinessTurf Business
  • Home
  • News
  • TB TV
  • Magazine
  • Podcast
  • Media Info
  • Summit
  • Contact
  • Subscribe
  • Turf Business Facebook
  • Turf Business Twitter
  • Turf Business Instagram
  • Home
  • News
  • TB TV
  • Magazine
  • Podcast
  • Media Info
  • Summit
  • Contact
  • Subscribe
  • Turf Business Facebook
  • Turf Business Twitter
  • Turf Business Instagram
Estadio BBVA installs three SIS Pitches solutions ahead of World Cup

Estadio BBVA installs three SIS Pitches solutions ahead of World Cup

4 Dec 2025

Preparations ahead of the next World Cup are in full swing, with less than a year until the tournament commences on June 11, 2026.

 

The first to be hosted across three nations, 48 teams from six confederations will travel across North and Central America over the course of a month, visiting 16 venues to decide the winner. It’s arguably the most logistically complex football tournament ever held, laying the foundations for a similarly ambitious centenary edition in 2030.

 

Estadio BBVA will be one of three Mexican stadiums used in 2026. Having opened in 2015 as the new home to Liga MX team CF Monterrey, the ground and much of its surrounding infrastructure already met FIFA guidelines. Recognising the need for playing surface improvements, however, the management team sought a full refit of the pitch in early 2025 to prepare it for the crucial months ahead.

 

This is where SIS Pitches entered the frame.

 

Elite in 10 weeks

 

The client brief was simple: deliver a pitch fit for World Cup standards and specification, playable within 10 weeks.

 

This short window was particularly challenging given the changes agreed through early consultation. Estadio BBVA’s old playing surface was to be fully excavated to make way for a series of advanced drainage and aeration systems developed by SIS. Once installed, the top layer would then be fitted with a hard-wearing stitched hybrid pitch.

 

Working together, these components not only promote ideal root zone growth conditions but also allow stadiums to manage a packed calendar of fixtures and events without impacting the quality of their playing surface. This was especially important for Estadio BBVA, with a packed summer of events and a full domestic football season planned before and after the World Cup.

 

The planning and process

 

As with any large project of this kind, the key to successful delivery lies in good preparation.

 

SIS and Estadio BBVA agreed work would commence in May 2025, once CF Monterrey’s season concluded. From the early conversations held in January, this gave the SIS team only a few months to plan, design and procure everything needed to deliver the new pitch in time.

 

Much like the ’26 World Cup, the project demanded solid logistics management. Everything had to be ready to go in May – equipment, materials and teams – if the 10-week turnaround was to remain achievable. In preparation, SIS had two containers shipped from Europe to Mexico in advance of work commencing.

Excavation took just over two weeks. Once the area had been fully cleared down to the formation level, trenches were dug for irrigation pipework to be laid. The sand bed was then added, with gravel and a root bed on top, and finished with fresh natural turf, grown 100km away in the turf farm chosen by the client and FIFA.

 

Among the world’s most advanced playing surface

 

Estadio BBVA represents an important step forward for SIS, as the first major stadium to install three of our solutions at a single project.

 

The first was a new version of SIS Air – a turf aeration and rainwater management system designed to promote stronger, healthier grass. For Monterrey, the system was upgraded with enhanced moisture and temperature sensors, allowing the site team to adapt to local conditions in Mexico, where natural grass typically struggles to thrive.

 

This upgrade was designed to work alongside SIS Aqua, an advanced pitch irrigation system with 35 pop-up units that can be individually controlled. This creates an even distribution of water across the pitch, delivering a uniform playing surface.

 

Finally – and key to meeting the 10-week turnaround – the stadium was fitted with SIS Hybrid. The installation of hybrid grass can be completed in as little as three days using SIS Pitches’ leading X-Gen machines, which were launched globally in 2025.

 

All set for the coupe du monde

 

SIS’s planning and logistics has paid off, with the stadium now set for one of the world’s most-watched sporting events.

 

Delivery was completed by 24 July, meeting the 10-week deadline. The result is an elite-level football pitch now capable of performing to the highest standards all year round, supported by a suite of tools that optimise play regardless of local conditions.

 

Since completion, SIS has been on site to hand over to the Estadio BBVA site team, advising on regular maintenance and scheduling. Initial feedback has been positive.

 

“Transforming Estadio BBVA into a World Cup-ready venue in just 10 weeks was a milestone for SIS. By integrating SIS Air, SIS Aqua and our turf, we’ve delivered a surface that meets the highest standards of play and durability. It’s a proud moment – not just for our team, but for what this project represents in terms of innovation and collaboration.”

 

Carlos Reis, Operations Director

Related Posts

Baroness proves a cut above at Harborne Golf Club

Featured, News

Baroness proves a cut above at Harborne Golf Club

Kubota keeps Glasgow City Council running, whatever the weather!

eNews Slot 6, Featured, News

Kubota keeps Glasgow City Council running, whatever the weather!

Hydrate: Preparing turf managers for the future of water management

eNews Slot 2, Featured, News

Hydrate: Preparing turf managers for the future of water management

  • Contact us
  • Privacy Policy
Turf Business
© TurfBusiness 2025. All Rights Reserved.
Tigerfish - Build | Promote | Succeed
This website uses cookies to improve your experience. We'll assume you're ok with this, but you can opt-out if you wish.No Problem Reject Learn More
Privacy & Cookies Policy

Privacy Overview

This website uses cookies to improve your experience while you navigate through the website. Out of these, the cookies that are categorized as necessary are stored on your browser as they are essential for the working of basic functionalities of the website. We also use third-party cookies that help us analyze and understand how you use this website. These cookies will be stored in your browser only with your consent. You also have the option to opt-out of these cookies. But opting out of some of these cookies may affect your browsing experience.
Necessary
Always Enabled
Necessary cookies are absolutely essential for the website to function properly. This category only includes cookies that ensures basic functionalities and security features of the website. These cookies do not store any personal information.
Non-necessary
Any cookies that may not be particularly necessary for the website to function and is used specifically to collect user personal data via analytics, ads, other embedded contents are termed as non-necessary cookies. It is mandatory to procure user consent prior to running these cookies on your website.
SAVE & ACCEPT
MENU
  • Home
  • News
  • TB TV
  • Magazine
  • Podcast
  • Media Info
  • Summit
  • Contact
  • Subscribe
  • Turf Business Facebook
  • Turf Business Twitter
  • Turf Business Instagram